Powered By Kitlog Pro v2.0
WILLIAM'S WEB SITE
RV 7
All
8-14-2021
< Previous Log Entry
Next Log Entry >
Date:
8-14-2021
Number of Hours:
4.00
Manual Reference:
7-9
Brief Description:
Pitot And AOA Installation
Today I plumbed the pitot and AOA tubes through the left wing ribs. I used the template supplied with the Dynon pitot/AOA kit to drill and cut the opening for the mast.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV 7 Home
Category
# Logs
# Hours
All
210
795
Empennage
48
122
Fuselage
4
17
Miscellaneous
7
17
Tools
2
3
Wings
149
636
Copyright © 2001-2024 Matronics. All Rights Reserved.